What number should a systems build actually be held to
A typical proposal for a CRM and systems build across a small portfolio reads as all nouns in the deliverables section. Pipelines configured, sequences written, integration connected, training session delivered. Every one of those is verifiable and none of them says whether the thing worked. Asking for a number in the agreement usually gets the same answer: consultants can't be held to conversion because they don't control who answers the phone, which is fair. Nobody can promise an outcome and shouldn't be asked to. But taken all the way, that argument leaves the only accountability as whether the software is switched on. The realistic candidates. Speed to lead, which the system genuinely controls, though it says nothing about whether anyone converts. Percentage of leads with a logged touch inside seven days, which measures whether people actually use what got built. Appointments set per hundred leads, closer to the money and heavily dependent on staff execution. Or no number at all, judged in month three by whether anyone opens the system. A measurable line in writing is usually worth insisting on for a buyer who wants the boring version that works, with one caveat: a number in a contract tends to get optimized for its own sake rather than for the outcome it was meant to stand in for. What would the room actually put in writing, if anything.
Should a CRM build agreement include a measurable target?
29 votes