Cross-collateralized transactional funding on a double close: who has actually read the security instrument before signing
A case worth studying here. Take a 1.6M double close where the transactional lender funds the A-to-B leg for 24 hours at two points. The security instrument pledges the subject property as collateral, which everyone expects, but on a same-day or next-day close the lender's recorded interest does not release until the B-to-C wire clears and the lender confirms receipt. If the end buyer's wire is delayed even four hours past the scheduled closing window, you have a recorded lien against a property you no longer legally own, a title company that may pause the B-to-C disbursement, and a transactional lender whose remedy language in most instruments I have read allows them to extend the loan at a penalty rate per diem rather than calling it. That penalty rate is often not in the term sheet. It surfaces on page six of the security instrument under default and cure. On a 1.6M loan at two points, a 48-hour delay at a 1.5 point per diem penalty is not a rounding error. The assumption doing the most work in any transactional funding deal is that the B-to-C close is certain and same-day, and that assumption is sized on the end buyer's wire discipline, which you cannot fully control. Have you read the default and cure section of your transactional lender's security instrument, and does it distinguish between a wire delay caused by the title company and one caused by your buyer?