The partial demo almost certainly hurts the land value compared to leaving the building intact, and here is why.
A vacant but intact 1940s masonry building still has option value. A buyer can assess the structure, decide to convert it, and start from a known baseline. A stripped shell changes that calculus because whoever buys it now inherits sunk demo costs they did not control, an interior they cannot evaluate the way they would an untouched building, and potential structural unknowns from whoever did the work. The broker calling it "value-add" is technically accurate in the sense that work remains to be done, but that framing skips the part where the partial work may have created new problems rather than solved old ones.
On the appraisal question specifically: how a lender or appraiser treats it depends on what the highest and best use is now. If the remaining shell has no realistic conversion path, the appraiser may fall back to land value minus demolition cost, meaning the land is worth less than raw land because the buyer still has to pay to clear the structure. That is the outcome you are worried about, and it is a real one.
The number I would want before going further is a structural engineer's assessment of the remaining shell. Whoever stopped mid-job may have left the masonry compromised, or it may be fine. That report changes the entire conversation because it tells you whether the building is still an asset or has become a liability sitting on the site.
I would also want to know why the previous buyer stopped. Permit issue, financing, entitlement problem, or something they found inside? That answer often tells you more than the building does.
What does the broker know, or claim to know, about why the project stalled?