Paper lots beside a hotel site and the entitlement timing that decides which one you sell first.
A developer controlling a 4-acre parcel at an interstate interchange recently faced a split the pro forma did not anticipate. The site could carry a 90-key select service hotel on 1.8 acres, leaving a residual 2.2 acres that entitled cleanly as three pad sites. The question was not whether to build the hotel. The question was whether to sell the pads first and use those proceeds to reduce the construction loan draw, or to hold the pads and sell them into a stabilized hotel exit where the buyer would pay a premium for adjacency. At a $400k-per-pad estimate on the front end and a stabilized hotel trading at a 7.5 cap on $1.4M of projected NOI, the math on sequencing matters more than the math on either asset alone.
Selling pads first generates roughly $1.2M before close of construction, which at a 65 percent LTC loan reduces the drawn balance enough to drop the interest carry by around $80k over an 18-month build and stabilization period. That is not transformative but it is real, and it removes one source of lender pressure during the period when a hotel is most vulnerable, which is the lease-up quarter before it clears the debt service coverage covenant. The cost is that you have sold optionality. A hotel stabilizing at or above underwriting makes those pad sites worth materially more to the buyer who wants the whole block, and you gave that upside away at the construction-phase price.
Holding the pads and selling them into the exit works if the hotel buyer is a flag or a regional operator who values control of the adjacent land to prevent a competing flag from going in next door. That buyer will pay for the pads above market because for them it is a defensive purchase, and you capture that premium only if you have held both assets together. The risk is that the hotel misses stabilization, the lender gets impatient, and you are selling pads into a distressed timeline rather than a competitive one, which wipes out the premium and may force a price below the construction-phase estimate.
The assumption doing the most work here is whether the hotel buyer actually assigns defensive value to pad adjacency, and that is a market judgment, not a modeling judgment. In a supply-constrained corridor with two flags already expressed, the answer is probably yes. At a commodity interchange with open land in every direction, the buyer will pay land value and nothing more, and the sequencing premium disappears.
What does the entitlement on those pad sites look like, and are they shovel-ready at hotel delivery or is there a secondary process still running?