Keep a framing crew on payroll or stay all subs, when almost nobody can fill positions
Twice this year I've been asked to frame for builders doing one-off spec houses, and my crew is small. Both times I said no because my guys were booked, and both times the builder waited five or six weeks for somebody else. That got me thinking about the other side of it.
If you're building one or two spec houses a year, the standard answer is you sub everything. You pay per house, you carry no payroll between jobs, and your overhead is basically your truck. That's clean.
But labor is the constraint right now, not money and not permits. The contractor surveys keep saying something like 94 percent of firms can't fill positions. If that's true and it stays true, the builder who has four framers on W-2 controls his own schedule and the builder who doesn't is standing in line. The cost is you're paying those four people in February when the ground is frozen and you have nothing to put them on.
I genuinely don't know which side I'd land on if I were building instead of subbing. Curious what the people actually building think.
Small builder, one to three houses a year. Labor model?
27 votes