Discussion
I am working through a case that keeps coming up in small spec building: a builder pulls permits on two houses within the same quarter, expecting the second draw to follow the fir…
Discussion
A cleared infill lot in a settled neighborhood carries a number that looks like a comp but works like a trap. The houses around it set the ceiling on what a finished spec can sell…
Win
A case worth studying: a builder projected five months from permit to CO on a 380k spec home, carrying a construction loan at 10.5 percent interest-only on draws averaging 285k ov…
Discussion
Four townhomes under construction right now in Burleson and I am already getting DMs asking how I structure the builds, how I find the zoning pockets, how I handle the financing w…
Win
Closed the Garfield Heights spec last Friday, $287k, bought the lot for $41k in January 2023 and put $164k into the build. That's $82k gross before I back out the $14k in holding…
Happening Now
Here is the scenario. A spec home on a street goes full custom on finishes, quartz everywhere and custom cabinetry throughout, and prices 67k over the last sale on that street. It…
Happening Now
Paid $890 for a full package on a townhome in Garfield Park, Chicago, closed in November. Professional copy, floor plan graphic, the social tiles, everything. Unit sat 47 days and…
Loss
Consider a 2,340 square foot, two story, four bedroom spec home in an established neighborhood where similar houses trade between 545 and 590. This one appraised at 508 and sold a…
Happening Now
I've been trying to figure out where I fit on the service side of this business, and last week a guy I know through a contractor friend asked if I'd "handle the project" on a spec…
Discussion
Trying to write down everything I'd pay between putting a lot under contract and pouring footings, and my list keeps growing. So far: plan set, boundary survey, topo, soils report…
Happening Now
First one went okay, mostly by luck. This one is a slightly bigger lot in the same county and when I filed for the permit they came back asking for a stormwater management plan an…
Happening Now
I have a lot under contract, 62k, and a builder who says he'll do a 1,900 square foot single story for cost plus 12. He wrote the number on the back of a business card, which I un…
Discussion
A spreadsheet breaks once a build carries a draw schedule, subs invoicing at different stages, a couple of change orders, and a lender asking for backup on every line. For a build…
Loss
Take a builder who does one or two spec houses a year. Say he has a lot and a construction loan but needs money to cover the gap between draws, offering 12 percent for what he exp…
Poll
Third spec on the same plan, 1,850 square feet, entry level neighborhood where clean resales trade 372 to 388. Lot is paid for, permit is in hand, I break ground in three weeks an…
Loss
Consider a private lender who puts $62k into a spec build as a second position loan behind a $240k construction loan. Roughly 2,300 square feet in a decent suburban submarket, as-…
Loss
Take a spec build with these numbers. Lot at 88k, infill, already platted. Build budget 388k for 2,350 square feet, four bed, a standard plan a local builder had run three times b…
Win
Take a lot bought for 62,000 cash and a finished house that closes at 452,000, eleven months from first excavator to closing table, for a builder new to ground-up construction aft…
Poll
Two identical lots, same 1,900 square foot plan, budget of 268,000 vertical on each. Carry runs me about 2,900 a month once the loan is drawn up, so five months from framing to cl…
Happening Now
A spec build joint venture structured around an 8 percent preferred return, return of capital, then a 70/30 split to investors reads as a standard shape on its face. Consider a tw…
Discussion
The plan I had drawn was 3,200 square feet and the framing number came back so far over my budget that the whole thing stopped working, even before I priced the mechanicals. Meanw…
Poll
Take a finished spec, listed at 469, three weeks in with decent traffic and no offer. The builder's agent wants to advertise a permanent buydown, roughly 12k of points to the buye…
Poll
I've got two things I could put the same money into and I've been stuck on this for three weeks. The first is four raw acres in a growing outer suburb, priced around 112k, that wo…
Poll
My first rental hasn't even closed yet, so I'm asking about someone else's problem that I've been shown the spreadsheet for. A builder I know has a finished four bedroom sitting a…
Win
1,720 square feet, three bed two bath, single story, small city in the middle of the country where the median is around 350. Sold at 392 with a 26 day marketing period. Numbers as…
Discussion
Work through a spec build with these numbers. Lot at 180k, a 2,400 square foot plan, best hard cost number at 165/sf so call it 396k. Soft costs penciled at 55k. That is 631k all-…
Happening Now
Got a term sheet back for a single spec house, first one for me. Lot's already mine, bought it last year for 62k with cash. Build budget from the contractor is 288k for 1,850 squa…
Poll
When a framing crew turns down two separate requests to work on one-off spec houses because the crew is already booked, and the builder waits five or six weeks for someone else bo…
Discussion
Anyone pricing a couple of vacant lots runs into this. Every builder quotes a different cost per square foot for what sounds like the same house. One says 145, one says 190, and a…
Happening Now
There's a cleared lot two streets over from a subdivision that finished last year. Asking 78k, flat, water and sewer in the street per the listing. I've never built anything. I've…
Happening Now
Same plan set, same builder, same submarket, three houses in fourteen months. 1,850 square feet each. House one: 158 a foot hard cost. House two: 166. House three, quoted last wee…
Discussion
Here is a question that trips up a lot of first time spec builders. An investor watching a handful of lots reads up on the owner-builder permit and understands it this way: if you…
Happening Now
Take a case with numbers, since the shape of the problem matters more than any single builder's story. House A: 2,100 sf, framed and dried in three weeks prior. Lot cost 95k, hard…
Poll
Consider a small builder doing four to six houses a year, watched from a distance for two years before any move is made. He has a finished 1,700 foot three bedroom sitting since A…
Poll
Consider a builder with eleven years swinging a hammer and experience running other people's jobsites, so framing and sequencing are not the concern. Carrying the money side of a…