My carry cost came in at $1,840 a month more than I projected and I did not catch it until month four.
That is not a rounding error, that is a full permit fee I forgot to spread across the timeline. I have been in real estate fifteen years and I still did not write down what the interest reserve would actually cost once the draw balance climbed past 60 percent. The lender showed me the reserve line at close and I nodded like I understood it. I did not. By month four on a spec I am watching in Riverside right now, the reserve had burned faster than the construction schedule, and the gap came from one thing: I estimated draws on the low end of each phase and the subs billed to the high end, every single time. That is not fraud, that is just how subs bill. The interest accrues on what is actually drawn, not on your optimistic projection, and nobody at the closing table said that plainly enough for me to build it into my month-by-month cash flow. The number I had on paper was $3,200 a month in carry. The real number through month six averaged $5,040. I want to know if anyone else has seen that same draw-versus-projection gap widen past 50 percent, and whether you caught it early or the way I did.