The draw schedule says one thing and the appraisal says another, and that gap is where spec builds stall
A construction lender orders an as-completed appraisal before the first dollar moves, and that number sets the loan ceiling. The problem surfaces at draw three or four, when the appraiser's assumed finish level and what the builder actually specified start to drift apart. Say the appraisal assumed standard cabinet boxes and the builder upgraded mid-build. The hard cost went up 18k. The appraised value may have moved 6k. The lender does not care about the other 12k because the loan-to-value ratio is already at its ceiling, so the builder funds the gap out of pocket or the draw gets held. That gap is not a paperwork problem, it is a cash problem that arrives during the most expensive phase of the build. The assumption doing the most work in any spec budget is that the as-completed appraisal comes in at or above the finish level the builder chose, and most builders price the finish first and check the appraisal second, which is the wrong order. The question worth asking before a single upgrade decision: what finish level did the appraiser assume, and is it written into the appraisal report or just implied by the comps they pulled? What finish spec did your lender's appraiser actually document?