Own GC on a first spec home, or hire one and learn by watching
Consider a builder with eleven years swinging a hammer and experience running other people's jobsites, so framing and sequencing are not the concern. Carrying the money side of a house owned outright is the new part, with a lot under contract and a real choice between pulling a builder license to GC it directly or paying someone 9 or 10 percent of hard cost to run it while learning the weaker areas. The case for self-GCing is straightforward. On a 380k hard cost, that fee runs around 35k, a real slice of a first project's margin, and a builder with sub relationships already knows most of the trades by name. The case for hiring is less obvious but still real. A GC with an established book of subs tends to get called back faster, and in a market where crews are hard to fill, having a framer show up in week two instead of week seven can be worth more than the fee saved. The license question differs by state, so what a given state actually requires to pull permits in an individual's own name needs to be confirmed before assuming it is possible. On a genuinely first project, the case for hiring an experienced GC and learning the money side alongside them tends to outweigh the fee saved by self-GCing, given how much a slow crew can cost in carry.
First ground-up spec: who runs the build?
13 votes