Public records show the permit was pulled in 2004, but the water heater in the utility room is dated 2019.
That fifteen-second gap is where I start on every walkthrough, before I touch a single faucet or flip a breaker. The permit record tells you what the municipality knew. The equipment date tells you what actually happened since. When those two diverge, you have a conversation to have with the seller before the inspector ever shows up, because the inspector can tell you the water heater works, but only the permit history can tell you whether anyone was watching when it went in. A rooming house I studied had four electrical subpanels added over twelve years, one permit pulled, and the city file showed three separate owners. The inspector flagged deferred maintenance. The permit record flagged something closer to concealment. Those are not the same finding and they do not cost the same to resolve. I read the city file before the listing sheet because the listing sheet is a sales document and the city file is not. What I want to know the moment I walk in is whether the visible age of the mechanical systems matches the permit timeline, and if it does not, whether the gap runs toward unpermitted work or toward work that was permitted and then modified later, because those carry different liability. So the first question I ask on any walkthrough is not about the roof or the foundation. It is: what has been touched since the last permit closed, and where is the documentation? What does your permit pull actually show for the mechanical systems on this one?