The horizontal work: one turnkey site contractor, or do you hire the subs yourself
This is the question I get asked most by people who've never built improvements before, and the answers I hear from experienced developers split about evenly, so I'll put it to the room.
Say you've got approval on a 22 lot subdivision. Now somebody has to clear, mass grade, put in a storm system, run water and sewer, set the base and pave, then survive the county's inspection and acceptance. Two ways to buy that.
One, hire a single site contractor who does the whole horizontal package under one contract. You get one number, one schedule, one throat to choke. You pay for that coordination in the price, and on small jobs the markup on the trades they sub out can be meaningful. You also lose visibility into where the money actually went, which matters when a change order shows up.
Two, contract the pieces separately. Earthwork with one outfit, wet utilities with another, paving with a third under your own coordination. Cheaper on paper. But you own every gap between scopes, and in horizontal work the gaps are expensive, because the utility contractor's trench and the paving contractor's subgrade meet at a place where nobody wrote down whose job it was.
My own bias comes from doing very small deals where the turnkey premium was a big share of a thin margin. On something bigger I'm genuinely unsure. And I'd note that in some states you need a license to act as the general on public improvements even on your own project, which is worth confirming before you plan on self-managing.
22 lot subdivision, how do you buy the horizontal work?