On the horizontal work, do you hire one turnkey site contractor or contract the subs yourself
This is the question that comes up most from people who have never built improvements before, and the answers from experienced developers split about evenly, so it belongs in front of the room. Say you have approval on a 22 lot subdivision. Now somebody has to clear, mass grade, put in a storm system, run water and sewer, set the base and pave, then survive the county's inspection and acceptance. There are two ways to buy that. One, hire a single site contractor who does the whole horizontal package under one contract. You get one number on one schedule, with a single party to hold accountable. You pay for that coordination in the price, and on small jobs the markup on the trades they sub out can be meaningful. You also lose visibility into where the money actually went, which matters when a change order shows up. Two, contract the pieces separately. Earthwork with one outfit, wet utilities with another, and paving with a third under your own coordination. Cheaper on paper. But you own every gap between scopes, and in horizontal work the gaps are expensive, because the utility contractor's trench and the paving contractor's subgrade meet at a place where nobody wrote down whose job it was. On very small deals the turnkey premium is often a big share of a thin margin, which is why small operators lean toward self-managing. On something bigger the answer is genuinely less clear. And note that in some states you need a license to act as the general on public improvements even on your own project, which is worth confirming before you plan on self-managing.
22 lot subdivision, how do you buy the horizontal work?
30 votes