The county's well and septic setback rules are cutting my usable lot count before the engineer even touches the plat
A nine-acre parcel I am studying pencils at seven lots under the zoning minimums, but the county health department requires 150 feet of separation between any well and any septic system, and once you map that onto irregular lot shapes with a shared property line running diagonally, three of the seven lots lose their buildable envelope almost entirely. The engineer says the well placement can shift, but the septic field location is constrained by a seasonal drainage swale that the health department will not let you cross. So the real lot count is probably four, maybe five if one lot can share a community well with a recorded easement, which introduces a whole different approval track. The return math at four lots does not work at the basis I am looking at. At five it is marginal. At seven it was the deal. What I cannot figure out is whether the community well path actually shortens the timeline or adds six months of its own review, because if it adds time it probably adds cost faster than it adds lot value. Has anyone taken a parcel through a county health department well-and-septic review where the initial lot count dropped by more than one lot, and did you find a shared well structure that the county approved without treating it as a full utility district application?