The rate cap expired six weeks before the bridge loan did and the whole business plan was written around refinancing before that happened
A deal worth studying: a 24-unit acquisition financed with a 24-month bridge loan at SOFR plus 350, with a rate cap purchased to the loan's maturity date. The business plan called for a value-add rehab, stabilization at 93 percent occupancy, and a refinance into agency debt at month 20. The cap cost $41,000 at origination, which felt manageable against a $3.2 million loan. The problem was that the refinance did not close at month 20. It closed at month 26, six weeks after the cap expired. For those six weeks the loan floated fully uncapped, and the payment jumped roughly $9,400 above the capped figure because SOFR had moved significantly since origination. The operator had not budgeted for an uncapped period because the original timeline showed no gap. The carry shortfall came out of reserves that were already thinner than underwritten because two units took longer to turn than projected. Nothing catastrophic happened, but the deal absorbed a loss that the original model said could not exist. The number doing the most work in that original underwrite was not the rent growth assumption or the exit cap rate. It was the implicit assumption that the refinance would land before the rate cap did. The cap expiration date is a hard deadline the same way a loan maturity date is, and the business plan has to show a refinance that closes with enough cushion to absorb a 60 to 90 day slip. If the two dates are within 30 days of each other, the buffer is not a buffer. What does the rate cap timeline look like on whatever bridge debt is in the room right now, and is the refinance target date at least 90 days inside it?