The market everybody targets in a down cycle has already absorbed the lesson they came to teach
The instinct makes sense. Submarket has softened, land sellers are more realistic, construction pricing has come off peak, so you buy low into a trough and deliver into a recovery. I see that logic repeated often enough that it has become the default development thesis right now, and the problem with a default thesis is that the people running it are all underwriting the same absorption curve.
Take a 180 unit project with an 18 month lease-up assumption baked in at month 24 from break. If three other developers ran the same analysis on the same submarket and reached the same conclusion, you have 600 to 700 units chasing the same recovered demand at roughly the same delivery window. The submarket data that supported a 5 percent vacancy assumption was backward-looking. The forward vacancy number is the one that decides whether you clear your preferred return.
The fund agreement is where this risk actually lives, not the proforma. Most operating agreements I read give the sponsor discretion over delivery timing but say nothing specific about what triggers a lease-up extension or how absorption shortfalls affect the waterfall before the preferred is fully paid. That section feels like boilerplate until four competing projects deliver in the same quarter and effective rents drop 8 percent to win tenants.
The case worth studying is a 96 unit infill project that modeled 93 percent occupancy at stabilization using trailing 12 month comps from a supply-constrained period. Two competitors delivered during its lease-up. Effective rents came in 11 percent below proforma. The project still stabilized, but 14 months late, and the interest reserve was sized for 12. That gap came out of equity, not the construction lender, because the loan agreement defined stabilization as 90 percent occupancy for 60 days and the lender had no obligation to extend past that trigger.
What submarket are you building in, and how many units are currently permitted or under construction within a two mile radius of your site?