The rate cap and the exit date are the same risk dressed differently, and most QOF docs treat them as separate sections.
Say a fund holds a mixed-use OZ development with a floating rate construction loan capped through 2028 and a projected stabilization in mid-2029. The cap expires before the asset is producing enough income to refinance cleanly into permanent debt. If rates in 2028 are still in the range that caused the original cap purchase, extending or replacing the cap costs real money, and that cost sits in the capital stack before any distribution waterfall runs. The offering doc may show the cap as a line item in the construction budget and show the exit in a separate section under "investment highlights" with no bridge drawn between them. What actually matters is whether the fund has committed replacement cap coverage or has a reserve sized to buy it, and what happens to investor distributions if that reserve gets tapped before stabilization. The parallel risk on the equity side is that a 2031 exit modeled at a 5.2 cap assumes rent growth through a period where the asset may still be absorbing tenants, and if absorption runs slow, the exit cap the buyer underwrites could be 75 to 100 basis points wider, which on a $20M projected value is $3M to $4M off the gross proceed before fees touch it. What is the fund you are looking at showing as its rate cap expiration relative to its projected certificate of occupancy date?