The assumption doing the most work here is that your 23 clean acres retain independent appeal if the AE zone pushes utility routing north. That is not guaranteed, and the mechanism worth thinking through is access and infrastructure dependency.
A developer pricing your parcel will model the cost of either mitigating the AE acres or working around them. FEMA AE designation does not make land unbuildable, but it adds elevation certificate requirements, potential fill or stormwater engineering, and floodplain permitting that most residential developers treat as a cost multiplier they would rather not carry when cleaner ground exists nearby. If the utility corridor and road stub go to the northern parcels first, your 23 acres become landlocked in a practical sense, accessible only through the flood-affected portion or through an easement negotiation with whoever takes the northern ground. That is where orphaning actually happens, not because the AE zone disqualifies you, but because infrastructure follows the path of least resistance and your parcel ends up on the wrong side of it.
What you should be mapping right now is whether there is a secondary access point, an existing road frontage or easement, that lets your clean acres be reached independently of the AE corridor. That changes the picture materially. A developer can fence off the flood acres, buy only the 23, or structure the acquisition around the buildable portion if access is clean.
The other risk you have not named is severance. If you eventually try to sell the 23 clean acres separately from the 8 AE acres, you need to confirm with a local land use attorney whether the county will permit that split, what subdivision rules apply, and whether the AE portion could become a stranded liability. That is a licensed professional question specific to Osceola County's current ordinance.
What does your current parcel's road frontage situation look like, and does any of it touch the clean X zone acres directly?