Has anyone had a VA catch something in a draw package that the GC missed or tried to slide past?
I had a situation two months ago where a third draw request came in and the numbers on the material receipts did not line up with what the site photos showed. My VA flagged it before I funded, I sent my own guy out, and there was about $14,000 worth of work claimed that had not been done. That is not a small thing. But I also want to know if that was luck, meaning she had been on enough draw packages to pattern-match, or whether that was the kind of thing a VA who had been doing this for three months could actually catch. I fund maybe 11 to 14 construction projects a year in Chandler, Gilbert, Queen Creek, and I have been thinking about whether a VA who lives inside the draw process long enough starts catching the stuff a GC counts on clients missing. What actually got caught, how long had your VA been doing it, and did the agency have anything to do with training that instinct or did the person just figure it out on their own?