A land agent wants a 30-month option on acreage I've held since 2016
Got a letter, then a call, then a draft option agreement, and I'm out of my depth on the parts that matter. 62 acres, flat, cleared, about a mile and a half from a high voltage tr…
Data center investing means owning the specialized facilities that house computing and networking infrastructure, the physical backbone of the digital economy, leased to technology companies, cloud providers, and enterprises.
Log in to followGot a letter, then a call, then a draft option agreement, and I'm out of my depth on the parts that matter. 62 acres, flat, cleared, about a mile and a half from a high voltage tr…
Sponsor wants $6M from us by the 19th and I'm stuck on the phasing. Single asset vehicle, 48 MW of contracted critical load in an emerging Sun Belt market off the I-20 corridor. T…
I've got about $150k I want to put toward this sector and two routes on my desk, and after three weeks of reading I still can't articulate the difference in what I'd actually own.…
The deck reached me through someone from my old industry and I have until the 19th to fund or pass. LP minimum is 75k, which is most of what I have set aside, so I would rather be…
Working through the diligence file on a stabilized fund's largest asset and I've spent two days on one exhibit. The asset is described everywhere in the marketing as a 32 MW facil…
Reading a participation offer on a mezz note and the gap is sitting right there in the reserve schedule. Shape of it: 24 MW powered shell under construction in a Sun Belt secondar…