The emergency-call system vendor wanted a seven-year term on a 72-unit deal, and the early-termination clause was buried in the exhibits.
The base contract looked fine: monthly monitoring fee, quarterly testing, liability cap that matched the insurance requirement. What the LOI summary left out was a liquidated-damages clause in Exhibit C that set the buyout at 80 percent of remaining contract value with no proration for unit count if occupancy fell below 85 percent. On a 72-unit building at a $38 monthly fee per unit, a stabilization delay of six months that pushed occupancy to 82 percent would have triggered the clause and added roughly $93,000 to the exit cost of a contract the buyer assumed was cancelable on 90 days notice. The asset manager caught it on page 41 of the vendor package, two days before closing. The seller had signed the original term in year one when the building was full and the clause felt theoretical. By acquisition it was not theoretical at all. The fix was a seven-year term renegotiated to three with a per-unit proration rider, which the vendor accepted because they wanted the renewal relationship on a building the buyer was planning to expand. How long are the vendor contracts running on the 55-plus deals you are looking at right now, and has anyone actually read the termination exhibits?