Loss
I have been on probate deals where the seller's estate attorney used language like that to describe a title cloud that took eight months to clear, so maybe I'm sensitized to it, b…
Discussion
Sponsor sold me on a 10-year NNN to a single hyperscaler and I kept nodding like that was the story. Took me until the third call to figure out the real upside was the 38-acre lan…
Discussion
Take a $200k allocation and two places it could sit. The first is a preferred equity position in a 20 MW build to suit in Gainesville, Virginia. Senior debt is $180M, total capita…
Win
Hyperscaler came in at month eight and bought the whole stack. Expected to sit until month 26. Ended up with a 22% IRR on a deal I'd penciled for 16.
Loss
Conventional thinking has been that passive exposure here means steady distributions, maybe 6 to 7% cash on cash, and a sponsor team that keeps you informed. Consider a case. An L…
Poll
Marking up an offering package for a passive data center position raises the obvious bubble question, and most answers stop at structural demand drivers without saying what an inv…
Poll
I've been reading through public filings for the listed data center owners because I wanted to understand what a passive holder actually pays out of the rent before anything reach…
Poll
Fund summaries for data center holdings often quote a distribution figure that includes a line called power and infrastructure reimbursement, which is typically the tenant paying…
Poll
Take an LP slice in a 9 MW single-tenant data center in a secondary market. The lease runs twelve years with two five-year renewals at market. The power side is a seven-year block…
Loss
Consider a bridge loan of $6.8m, 12 months with two six month extensions at a point each, secured by 62 acres of ag-zoned land outside a growing metro with transmission running al…
Discussion
A typical sheet reads: data center ABS, 5 year term, investment grade rating, secured by long term leases to investment grade hyperscale tenants, target coupon in the mid 5s, coll…
Happening Now
Got a letter, then a call, then a draft option agreement, and I'm out of my depth on the parts that matter. 62 acres, flat, cleared, about a mile and a half from a high voltage tr…
Discussion
I've been comparing the two ways I can actually get at this as a passive holder. Listed REITs, where I can read the 10-K, and a non-traded private fund a broker sent me at 1.25% m…
Discussion
In a small county, mostly pasture and timber, a utility upgrade along a highway tied to a data center campus optioned nearby raises a common question for a landowner a couple of m…
Happening Now
Sponsor wants $6M from us by the 19th and I'm stuck on the phasing. Single asset vehicle, 48 MW of contracted critical load in an emerging Sun Belt market off the I-20 corridor. T…
Happening Now
I've got about $150k I want to put toward this sector and two routes on my desk, and after three weeks of reading I still can't articulate the difference in what I'd actually own.…
Discussion
Here is a scenario worth working through. 140 acres, a 345kV line crossing the northeast corner, and the parcel sitting about 8 miles off an I-20 interchange. A developer's land t…
Discussion
I'm reading a fund deck for a stabilized 32MW facility in a secondary market. Going-in cap 6.1%, 15 year triple net lease to an investment grade cloud tenant, 2.5% fixed escalator…
Happening Now
The deck reached me through someone from my old industry and I have until the 19th to fund or pass. LP minimum is 75k, which is most of what I have set aside, so I would rather be…
Discussion
Every article about this sector talks in billions and megawatts, and it ranks first for investment demand, so I assumed there was no entry point for someone with a few hundred dol…
Happening Now
Diligence on a stabilized fund's largest data center asset can turn on a single exhibit. The marketing materials might describe the asset as a 32 MW facility. The lease's Exhibit…
Loss
A useful case for anyone underwriting a data center as a passive hold: a single story purpose-built colocation building in a secondary metro, about 22,000 square feet, roughly 1.5…
Win
After months spent reading fund decks for data center exposure, a common conclusion is that the power story in most of them cannot actually be verified from the outside. Minimums…
Discussion
A colocation lease abstract looks almost nothing like the leases most investors are used to reading. Rent is quoted per kW per month. There is a defined critical load figure that…
Happening Now
Consider a mezz note participation on a 24 MW powered shell under construction in a Sun Belt secondary market with cheap industrial power. Senior construction debt of 46 million s…
Poll
A question worth working through directly: on paper a data center is a building with a lease, so it reads as real estate. But the actual drivers are technology company capital spe…
Poll
Chasing a question I can't settle. A facility built around 2014 for something like 6 to 8 kW per rack, air cooled, decent connectivity, on a feed with modest headroom. Fully lease…
Poll
There are two very different shapes of data center risk worth weighing against each other for a long hold. One shape: a single tenant, one of the very large technology companies,…
Discussion
The phrase secured power appears in nearly every data center writeup, and every one treats it as the thing that makes an asset valuable, which is fair. What rarely gets pinned dow…
Loss
This is a small loss by the standards of this room but I'd rather write it up than pretend it didn't happen. Early last year a guy I've done renovation work for put together an LL…
Win
Take a passive LP position in a two-building powered shell campus in a secondary Sun Belt market, 24 MW of contracted utility capacity across both buildings. Building A, 12 MW, le…
Poll
Been chewing on this since a broker sent me two things in the same week and they're basically opposite bets. One is a fractional interest in an operating facility in an establishe…